42-433-32671

Final Completion

ABERNATHY C.G.

STONEWALL County · District 7 · SMITH PIPE OF ABILENE · CHARLES ABERNATHY (BEND CONGL.)

RRC Lookup

Permits

1

Max Depth

6,200 ft

First Permit

1990-12-10

Latest Activity

1990-12-10

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1992-08-08

Shut-In

Plugged

2002-01-23

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: CREGO EXPLORATION (reported 1995-02)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: CREGO EXPLORATION

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2002-02

Operator History

originally filed by CREGO EXPLORATION — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#382187 A CREGO EXPLORATION
received 1990-12-10

Well Details

Well Number
2
Max Depth
6,200 ft
Drill Type
Vertical
County
STONEWALL
District
7
Completed
1992-08-08

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora