42-435-32142

Final Completion

BROCKMAN GEORGE

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)

RRC Lookup

Permits

1

Max Depth

5,000 ft

First Permit

1979-02-13

Latest Activity

1979-02-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-12-30

Shut-In

Plugged

1993-03-31

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: PERLMAN, WILLIAM

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1993-03

Operator History

originally filed by PERLMAN, WILLIAM — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#42430 A PERLMAN, WILLIAM
received 1979-02-13

Well Details

Well Number
3
Max Depth
5,000 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1979-12-30

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora