42-435-32181

Final Completion

SHURLEY

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)

RRC Lookup

Permits

1

Max Depth

6,200 ft

First Permit

1979-06-12

Latest Activity

1979-06-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1979-10-08

Shut-In

Plugged

2009-04-07

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: BURLINGTON RESOURCES O & G CO LP (reported 2001-11)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: EL PASO NATURAL GAS CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2009-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#50495 A EL PASO NATURAL GAS CO.
received 1979-06-12

Well Details

Well Number
11
Max Depth
6,200 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1979-10-08

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora