42-435-32253
Final CompletionCAUTHORN DAN D
SUTTON County · District 7 · SMITH PIPE OF ABILENE · SHURLEY RANCH (CANYON)
Permits
1
Max Depth
7,500 ft
First Permit
1979-11-05
Latest Activity
1979-11-05
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1980-04-12
Shut-In
—
Plugged
1997-05-08
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: PERLMAN, WILLIAM
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1997-05
Operator History
originally filed by PERLMAN, WILLIAM — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#62918 A PERLMAN, WILLIAM
received 1979-11-05
Well Details
- Well Number
- 2
- Max Depth
- 7,500 ft
- Drill Type
- Vertical
- County
- SUTTON
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1980-04-12
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf