42-435-32284

Final Completion

WADE 52

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)

RRC Lookup

Permits

1

Max Depth

4,300 ft

First Permit

1979-12-14

Latest Activity

1979-12-14

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-03-10

Shut-In

Plugged

1997-11-19

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: DREYFUS, LOUIS NATURAL GAS CORP (reported 1997-03)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HNG OIL COMPANY

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#66843 A HNG OIL COMPANY
received 1979-12-14

Well Details

Well Number
1
Max Depth
4,300 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1980-03-10

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora