42-435-32343

Final Completion

DEBERRY-BOYETT UNIT

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SONORA (CANYON UPPER)

RRC Lookup

Permits

1

Max Depth

6,400 ft

First Permit

1980-05-09

Latest Activity

1980-05-09

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-12-04

Shut-In

Plugged

2008-09-03

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: HIGHMOUNT EXPL & PROD TEXAS LLC (reported 2008-02)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: EL PASO NATURAL GAS CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#80796 A EL PASO NATURAL GAS CO.
received 1980-05-09

Well Details

Well Number
3
Max Depth
6,400 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1980-12-04

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora