42-435-32393

Final Completion

HUDSPETH I

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)

RRC Lookup

Permits

1

Max Depth

8,000 ft

First Permit

1980-09-05

Latest Activity

1980-09-05

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-01-13

Shut-In

Plugged

2006-05-25

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: DOMINION OKLAHOMA TEXAS E&P, INC (reported 2005-02)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: PERLMAN, WILLIAM

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2006-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#91729 A PERLMAN, WILLIAM
received 1980-09-05

Well Details

Well Number
1
Max Depth
8,000 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1981-01-13

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora