42-435-32469

Final Completion

WEST

SUTTON County · District 7 · PIONEER GAS PIPELINE INC. · INTERSTATE (ELLENBURGER)

RRC Lookup

Permits

1

Max Depth

5,200 ft

First Permit

1981-03-02

Latest Activity

1981-03-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-07-23

Shut-In

Plugged

2009-06-25

!

EWA / Permit operator mismatch

Scheduling: PIONEER GAS PIPELINE INC. ≠ Permit: LOVELADY, IKE INC.

Resolved via: schedulingPIONEER GAS PIPELINE INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2009-06

Operator History

originally filed by LOVELADY, IKE INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#110302 A LOVELADY, IKE INC.
received 1981-03-02

Well Details

Well Number
3
Max Depth
5,200 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1981-07-23

Operator

Location
SAN ANGELO
P-5 Status
Y (filed 2025-09-04)
Cum Oil (all leases)
93 bbl
Cum Gas (all leases)
143,918 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, OPRS/O

External Links

Live © 2026 Petrora