42-435-32517

Final Completion

FRIESS PAULINE D1

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)

RRC Lookup

Permits

1

Max Depth

6,500 ft

First Permit

1981-05-21

Latest Activity

1981-05-21

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-06-13

Shut-In

Plugged

2006-07-06

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: DOMINION OKLAHOMA TEXAS E&P, INC (reported 2005-10)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: ANDERSON PETROLEUM, INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2006-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#119096 A ANDERSON PETROLEUM, INC.
received 1981-05-21

Well Details

Well Number
2-7
Max Depth
6,500 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1981-06-13

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora