42-435-32555
Final CompletionRICHARDSON -135-
SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (LEONARD)
Permits
1
Max Depth
8,800 ft
First Permit
1981-08-04
Latest Activity
1981-08-04
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1981-12-01
Shut-In
—
Plugged
2009-03-04
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: AMERICAN EXPLORATION COMPANY (reported 1993-07)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HNG OIL COMPANY
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2009-03
Operator History
originally filed by HNG OIL COMPANY — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#128416 A HNG OIL COMPANY
received 1981-08-04
Well Details
- Well Number
- 3
- Max Depth
- 8,800 ft
- Drill Type
- Vertical
- County
- SUTTON
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1981-12-01
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf