42-435-32555

Final Completion

RICHARDSON -135-

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (LEONARD)

RRC Lookup

Permits

1

Max Depth

8,800 ft

First Permit

1981-08-04

Latest Activity

1981-08-04

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-12-01

Shut-In

Plugged

2009-03-04

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: AMERICAN EXPLORATION COMPANY (reported 1993-07)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HNG OIL COMPANY

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2009-03

Operator History

originally filed by HNG OIL COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#128416 A HNG OIL COMPANY
received 1981-08-04

Well Details

Well Number
3
Max Depth
8,800 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1981-12-01

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora