42-435-32591

Final Completion

STEEN

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SONORA (CANYON UPPER)

RRC Lookup

Permits

1

Max Depth

5,800 ft

First Permit

1981-10-19

Latest Activity

1981-10-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1988-02-09

Shut-In

Plugged

2008-05-23

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: DOMINION OKLAHOMA TEXAS E&P, INC (reported 2004-08)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: EL PASO NATURAL GAS CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2008-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#137089 A EL PASO NATURAL GAS CO.
received 1981-10-19

Well Details

Well Number
20
Max Depth
5,800 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1988-02-09

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora