42-435-32821

Final Completion

FIELDS 20

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)

RRC Lookup

Permits

1

Max Depth

6,700 ft

First Permit

1982-08-16

Latest Activity

1982-08-16

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-10-25

Shut-In

Plugged

2001-11-19

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: DREYFUS, LOUIS NATURAL GAS CORP (reported 2000-06)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HNG OIL COMPANY

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2001-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#169392 A HNG OIL COMPANY
received 1982-08-16

Well Details

Well Number
5
Max Depth
6,700 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1982-10-25

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora