42-435-32956

Final Completion

ESPY 41

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)

RRC Lookup

Permits

1

Max Depth

6,500 ft

First Permit

1983-04-11

Latest Activity

1983-04-11

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

2006-05-05

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: AMERICAN EXPLORATION COMPANY (reported 1993-10)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: HNG OIL COMPANY

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2006-05

Operator History

originally filed by HNG OIL COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#191062 A HNG OIL COMPANY
received 1983-04-11

Well Details

Well Number
6
Max Depth
6,500 ft
Drill Type
Vertical
County
SUTTON
District
7

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora