42-435-33000

Final Completion

HILL-ALDWELL WINNIE R. TRUST B

SUTTON County · District 7 · SMITH PIPE OF ABILENE · ALDWELL RANCH (CANYON)

RRC Lookup

Permits

1

Max Depth

9,550 ft

First Permit

1983-08-02

Latest Activity

1983-08-02

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1983-09-28

Shut-In

Plugged

1997-10-21

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: DREYFUS, LOUIS NATURAL GAS CORP (reported 1996-06)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: BROWN, TOM INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-10

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#203717 A BROWN, TOM INC.
received 1983-08-02

Well Details

Well Number
1
Max Depth
9,550 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1983-09-28

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora