42-435-33153

Final Completion

MAYER RANCH A

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)

RRC Lookup

Permits

1

Max Depth

7,600 ft

First Permit

1984-05-31

Latest Activity

1984-05-31

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1985-01-11

Shut-In

Plugged

2000-03-07

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: DREYFUS, LOUIS NATURAL GAS CORP (reported 1997-01)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: STATEX PETROLEUM INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2000-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#240752 A STATEX PETROLEUM INC.
received 1984-05-31

Well Details

Well Number
1
Max Depth
7,600 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1985-01-11

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora