42-435-33202
Final CompletionWARD JOHN A. L
SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)
Permits
1
Max Depth
7,800 ft
First Permit
1984-09-26
Latest Activity
1984-09-26
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-03-02
Shut-In
—
Plugged
2009-02-04
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: DOMINION OKLAHOMA TEXAS E&P, INC (reported 2007-11)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: STATEX PETROLEUM INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2009-01
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#252806 A STATEX PETROLEUM INC.
received 1984-09-26
Well Details
- Well Number
- 49
- Max Depth
- 7,800 ft
- Drill Type
- Vertical
- County
- SUTTON
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1985-03-02
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf