42-435-34343

Final Completion

KELLY 125

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)

RRC Lookup

Permits

1

Max Depth

7,190 ft

First Permit

1994-08-31

Latest Activity

1994-08-31

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1995-01-06

Shut-In

Plugged

2008-09-10

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: AMERICAN EXPLORATION COMPANY

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1995-01

Last Production

2008-09

Operator History

originally filed by AMERICAN EXPLORATION COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#427525 A AMERICAN EXPLORATION COMPANY
received 1994-08-29

Well Details

Well Number
12
Max Depth
7,190 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1995-01-06

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora