42-435-34825
Final CompletionSHURLEY 99
SUTTON County · District 7 · SMITH PIPE OF ABILENE · SAWYER (CANYON)
Permits
1
Max Depth
6,550 ft
First Permit
1998-04-17
Latest Activity
1998-04-17
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1998-05-20
Shut-In
—
Plugged
2006-08-01
!
EWA / Production operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Production: DOMINION OKLAHOMA TEXAS E&P, INC (reported 2005-11)
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: DREYFUS, LOUIS NATURAL GAS CORP
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1998-05
Last Production
2006-07
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#475442 A DREYFUS, LOUIS NATURAL GAS CORP
received 1998-04-17
Well Details
- Well Number
- 13
- Max Depth
- 6,550 ft
- Drill Type
- Vertical
- County
- SUTTON
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1998-05-20
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf