42-435-34977

Final Completion

DAVIS C

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SONORA (CANYON UPPER)

RRC Lookup

Permits

1

Max Depth

9,000 ft

First Permit

1999-08-26

Latest Activity

1999-08-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1999-09-17

Shut-In

Plugged

2008-12-17

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: HIGHMOUNT EXPL & PROD TEXAS LLC (reported 2008-02)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: GRUY PETROLEUM MANAGEMENT CO.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1999-09

Last Production

2008-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#487014 A GRUY PETROLEUM MANAGEMENT CO.
received 1999-08-26

Well Details

Well Number
7R
Max Depth
9,000 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
1999-09-17

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora