42-435-36693

Final Completion

DEBERRY MECKEL UNIT

SUTTON County · District 7 · SMITH PIPE OF ABILENE · SONORA (CANYON UPPER)

RRC Lookup

Permits

1

Max Depth

6,700 ft

First Permit

2004-02-13

Latest Activity

2004-02-13

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2004-03-26

Shut-In

Plugged

2009-01-06

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: DOMINION OKLAHOMA TEXAS E&P, INC

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2004-03

Last Production

2009-01

Operator History

originally filed by DOMINION OKLAHOMA TEXAS E&P, INC — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#542015 A DOMINION OKLAHOMA TEXAS E&P, INC
received 2004-02-13

Well Details

Well Number
14
Max Depth
6,700 ft
Drill Type
Vertical
County
SUTTON
District
7
Completed
2004-03-26

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora