42-441-32085
Final CompletionMC ANDREW
TAYLOR County · District 7 · FEDERAL OIL INC. · LAKE ABILENE (CROSS CUT)
Permits
1
Max Depth
4,650 ft
First Permit
1981-12-31
Latest Activity
1981-12-31
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1985-03-20
Shut-In
—
Plugged
1994-08-01
!
EWA / Permit operator mismatch
Scheduling: FEDERAL OIL INC. ≠ Permit: PETRO-MACK, INC.
Resolved via: scheduling → FEDERAL OIL INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1998-01
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#146217 A PETRO-MACK, INC.
received 1981-12-31
Well Details
- Well Number
- 1
- Max Depth
- 4,650 ft
- Drill Type
- Vertical
- County
- TAYLOR
- District
- 7
- Operator
- FEDERAL OIL INC.
- Completed
- 1985-03-20
Operator
- Name
- FEDERAL OIL, INC
- Location
- BIG SPRING
- P-5 Status
- Y (filed 2006-07-07)
- Cum Oil (all leases)
- 342,448 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 30