42-441-32159
Final CompletionLOSS STORY
TAYLOR County · District 7 · NEAL JACK ENGINEERING INC. · LAKE ABILENE (4000)
Permits
1
Max Depth
4,800 ft
First Permit
1982-04-22
Latest Activity
1982-04-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-07-20
Shut-In
—
Plugged
2000-07-15
!
EWA / Permit operator mismatch
Scheduling: NEAL JACK ENGINEERING INC. ≠ Permit: OLYMPIA OIL CO., INC.
Resolved via: scheduling → NEAL JACK ENGINEERING INC.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2000-10
Operator History
originally filed by OLYMPIA OIL CO., INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#157730 A OLYMPIA OIL CO., INC.
received 1982-04-22
Well Details
- Well Number
- 2
- Max Depth
- 4,800 ft
- Drill Type
- Vertical
- County
- TAYLOR
- District
- 7
- Operator
- NEAL JACK ENGINEERING INC.
- Completed
- 1982-07-20
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2011-06-03)
- Cum Oil (all leases)
- 55,536 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 21