42-441-32245

Final Completion

ROCK D

TAYLOR County · District 7 · SMITH PIPE OF ABILENE · LAKE ABILENE (CROSS CUT)

RRC Lookup

Permits

1

Max Depth

4,700 ft

First Permit

1982-08-19

Latest Activity

1982-08-19

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1982-09-14

Shut-In

Plugged

1997-03-24

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: L.C.S. PRODUCTION COMPANY (reported 1996-02)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: FARMERS OIL AND GAS EXPLORATION

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1997-08

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#169633 A FARMERS OIL AND GAS EXPLORATION
received 1982-08-19

Well Details

Well Number
4
Max Depth
4,700 ft
Drill Type
Vertical
County
TAYLOR
District
7
Completed
1982-09-14

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora