42-441-32718

Final Completion

MCMILLON

TAYLOR County · District 7 · SMITH PIPE OF ABILENE · EASTER-BELLE (LOWER GRAY)

RRC Lookup

Permits

1

Max Depth

5,100 ft

First Permit

1984-02-22

Latest Activity

1984-02-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-04-16

Shut-In

Plugged

1994-06-30

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TABCO EXPLORATION INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1994-07

Operator History

originally filed by TABCO EXPLORATION INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#230099 A TABCO EXPLORATION INC.
received 1984-04-24
#230099 A TABCO EXPLORATION INC.
received 1984-02-13

Well Details

Well Number
1
Max Depth
5,100 ft
Drill Type
Vertical
County
TAYLOR
District
7
Completed
1984-04-16

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora