42-441-32718
Final CompletionMCMILLON
TAYLOR County · District 7 · SMITH PIPE OF ABILENE · EASTER-BELLE (LOWER GRAY)
Permits
1
Max Depth
5,100 ft
First Permit
1984-02-22
Latest Activity
1984-02-22
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1984-04-16
Shut-In
—
Plugged
1994-06-30
!
EWA / Permit operator mismatch
Scheduling: SMITH PIPE OF ABILENE ≠ Permit: TABCO EXPLORATION INC.
Resolved via: scheduling → SMITH PIPE OF ABILENE
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1994-07
Operator History
originally filed by TABCO EXPLORATION INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (2)
#230099 A TABCO EXPLORATION INC.
received 1984-04-24
#230099 A TABCO EXPLORATION INC.
received 1984-02-13
Well Details
- Well Number
- 1
- Max Depth
- 5,100 ft
- Drill Type
- Vertical
- County
- TAYLOR
- District
- 7
- Operator
- SMITH PIPE OF ABILENE
- Completed
- 1984-04-16
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2024-07-03)
- Cum Oil (all leases)
- 17,644 bbl
- Cum Gas (all leases)
- 14,486 mcf