42-441-32794

Final Completion

HERRING HARRISON

TAYLOR County · District 7 · SMITH PIPE OF ABILENE · EASTER-BELLE (LOWER GRAY)

RRC Lookup

Permits

1

Max Depth

5,200 ft

First Permit

1984-06-18

Latest Activity

1984-06-18

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1984-10-18

Shut-In

Plugged

1996-11-20

!

EWA / Production operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Production: HEART LAND PETROLEUM CORPORATION (reported 1994-02)

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: FT. WORTH BASIN DEVELOPMENT,INC.

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1996-12

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#242258 A FT. WORTH BASIN DEVELOPMENT,INC.
received 1984-11-08
#242258 A HAMCO EXPLORATION DEVELOPMENT CO
received 1984-06-06

Well Details

Well Number
1
Max Depth
5,200 ft
Drill Type
Vertical
County
TAYLOR
District
7
Completed
1984-10-18

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora