42-441-33600

Final Completion

FARR A.P.

TAYLOR County · District 7 · SMITH PIPE OF ABILENE · VIEW E. (FLIPPEN)

RRC Lookup

Permits

1

Max Depth

3,000 ft

First Permit

1992-11-12

Latest Activity

1992-11-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1993-01-29

Shut-In

Plugged

1996-08-22

!

EWA / Permit operator mismatch

Scheduling: SMITH PIPE OF ABILENE ≠ Permit: L.C.S. PRODUCTION COMPANY

Resolved via: schedulingSMITH PIPE OF ABILENE

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-03

Last Production

1996-09

Operator History

originally filed by L.C.S. PRODUCTION COMPANY — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#405972 A L.C.S. PRODUCTION COMPANY
received 1992-11-12

Well Details

Well Number
1
Max Depth
3,000 ft
Drill Type
Vertical
County
TAYLOR
District
7
Completed
1993-01-29

Operator

Location
ABILENE
P-5 Status
Y (filed 2024-07-03)
Cum Oil (all leases)
17,644 bbl
Cum Gas (all leases)
14,486 mcf

External Links

Live © 2026 Petrora