42-441-33694
Final CompletionBROOKRESON
TAYLOR County · District 7 · AZTEX PETROLEUM · EL CABALLO BLANCO (FLIPPEN)
Permits
1
Max Depth
2,500 ft
First Permit
1994-07-18
Latest Activity
1994-07-18
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1994-08-09
Shut-In
—
Plugged
2012-12-13
!
EWA / Permit operator mismatch
Scheduling: AZTEX PETROLEUM ≠ Permit: NEAL, JACK ENGINEERING, INC.
Resolved via: scheduling → AZTEX PETROLEUM
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#425859 A NEAL, JACK ENGINEERING, INC.
received 1994-07-14
Well Details
- Well Number
- 3
- Max Depth
- 2,500 ft
- Drill Type
- Vertical
- County
- TAYLOR
- District
- 7
- Operator
- AZTEX PETROLEUM
- Completed
- 1994-08-09
Operator
- Name
- AZTEX PETROLEUM
- Location
- CHANDLER
- P-5 Status
- Y (filed 2014-11-07)
- Cum Oil (all leases)
- 6,004 bbl
- Cum Gas (all leases)
- 13 mcf