42-441-33812

Final Completion

ANTILLEY

TAYLOR County · District 7 · MIDLAND OIL AND GAS INC. · BIG EASY (PALO PINTO)

RRC Lookup

Permits

1

Max Depth

3,600 ft

First Permit

1997-01-28

Latest Activity

1997-01-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1997-03-05

Shut-In

Plugged

!

EWA / Production operator mismatch

Scheduling: MIDLAND OIL AND GAS INC. ≠ Production: D.J. & T. ENERGY (reported 2025-12)

Resolved via: productionD.J. & T. ENERGY

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1997-03

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#457893 A MIDLAND OIL AND GAS, INC.
received 1997-01-28

Well Details

Well Number
1
Max Depth
3,600 ft
Drill Type
Vertical
County
TAYLOR
District
7
Completed
1997-03-05

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-06-04)
Cum Oil (all leases)
4,391,169 bbl
Cum Gas (all leases)
144,800 mcf
Activities
OPRS/O
Total Permits
229

External Links

Live © 2026 Petrora