42-441-33823

SHUT IN Directional

KING

TAYLOR County · District 7 · SOJOURNER DRILLING CORPORATION · WEAVER SPRINGS (PALO PINTO)

RRC Lookup

Permits

3

Max Depth

6,250 ft

First Permit

1997-04-09

Latest Activity

1997-04-09

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Permit operator mismatch

Scheduling: SOJOURNER DRILLING CORPORATION ≠ Permit: HALLWOOD PETROLEUM, INC.

Resolved via: schedulingSOJOURNER DRILLING CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1998-03

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#460881 A HALLWOOD PETROLEUM, INC.
received 1998-04-03
#460881 A HALLWOOD PETROLEUM, INC.
received 1997-11-12
#460881 A HALLWOOD PETROLEUM, INC.
received 1997-04-09

Well Details

Well Number
2
Max Depth
6,250 ft
Drill Type
Directional
County
TAYLOR
District
7

Operator

Location
ABILENE
P-5 Status
Y (filed 2025-07-04)
Cum Oil (all leases)
11,100,018 bbl
Cum Gas (all leases)
9,636,290 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/O, OPRS/G, OPRS/O
Total Permits
869

External Links

Live © 2026 Petrora