42-441-33891
Final CompletionFARMER
TAYLOR County · District 7 · SOJOURNER DRILLING CORPORATION · WEAVER SPRINGS (PALO PINTO)
Permits
2
Max Depth
6,000 ft
First Permit
1998-09-09
Latest Activity
1998-09-09
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1999-11-04
Shut-In
—
Plugged
2024-10-08
!
EWA / Permit operator mismatch
Scheduling: SOJOURNER DRILLING CORPORATION ≠ Permit: HALLWOOD PETROLEUM, INC.
Resolved via: scheduling → SOJOURNER DRILLING CORPORATION
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1997-07
Last Production
2024-10
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (3)
#479338 A HALLWOOD PETROLEUM, INC.
received 1999-04-12
#479338 Pending HALLWOOD PETROLEUM, INC.
received 1999-03-26
#479338 A HALLWOOD PETROLEUM, INC.
received 1998-09-09
Well Details
- Well Number
- 2
- Max Depth
- 6,000 ft
- Drill Type
- Vertical
- County
- TAYLOR
- District
- 7
- Operator
- SOJOURNER DRILLING CORPORATION
- Completed
- 1999-11-04
Operator
- Name
- SOJOURNER DRLG. CORP
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-07-04)
- Cum Oil (all leases)
- 11,100,018 bbl
- Cum Gas (all leases)
- 9,636,290 mcf
- Activities
- CSGD/G, CSGD/P, G/PUR, GTHS/O, OPRS/G, OPRS/O
- Total Permits
- 869