Permits
1
Max Depth
3,000 ft
First Permit
2000-07-11
Latest Activity
2000-07-11
Lifespan
< 1 yr
Regulatory Status
Schedule
ON SCHEDULE
Completion
2000-11-01
Shut-In
—
Plugged
—
P-5 Org Status: Active
!
EWA / Permit operator mismatch
Scheduling: ABILENE AMERICAN ENERGY LLC ≠ Permit: ROYAL TEXAS PETROLEUM
Resolved via: production → ABILENE AMERICAN ENERGY, LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
2001-02
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#497083 A ROYAL TEXAS PETROLEUM
received 2000-07-11
Well Details
- Well Number
- 1A
- Max Depth
- 3,000 ft
- Drill Type
- Vertical
- County
- TAYLOR
- District
- 7
- Operator
- ABILENE AMERICAN ENERGY LLC
- Completed
- 2000-11-01
Operator
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-04-04)
- Cum Oil (all leases)
- 80,864 bbl
- Cum Gas (all leases)
- — mcf
- Activities
- OPRS/O
- Total Permits
- 6