42-441-81631
Final CompletionJACOBS J.C.
TAYLOR County · District 7 · AMERICAN ENERGY · TAYLOR COUNTY REGULAR
Permits
1
Max Depth
2,800 ft
First Permit
1983-03-14
Latest Activity
1983-03-14
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-04-01
Shut-In
—
Plugged
1996-06-23
!
EWA / Permit operator mismatch
Scheduling: AMERICAN ENERGY ≠ Permit: ARIES OPERATING, INC.
Resolved via: scheduling → AMERICAN ENERGY
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
1996-07
Operator History
originally filed by ARIES OPERATING, INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#188418 A ARIES OPERATING, INC.
received 1983-03-14
Well Details
- Well Number
- 1
- Max Depth
- 2,800 ft
- Drill Type
- Vertical
- County
- TAYLOR
- District
- 7
- Operator
- AMERICAN ENERGY
- Completed
- 1983-04-01
Operator
- Name
- AMERICAN ENGY
- Location
- ABILENE
- P-5 Status
- Y (filed 2004-05-07)
- Cum Oil (all leases)
- 53,824 bbl
- Cum Gas (all leases)
- 566 mcf
- Total Permits
- 1