42-443-30262

Final Completion

MITCHELL-STATE 22

TERRELL County · District 7 · HILLIN T. A. · OZONA (CANYON SAND)

RRC Lookup

Permits

2

Max Depth

6,000 ft

First Permit

1980-12-03

Latest Activity

1995-12-07

Lifespan

15 yrs

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1981-11-18

Shut-In

Plugged

2025-12-23

!

EWA / Production operator mismatch

Scheduling: HILLIN T. A. ≠ Production: PATNO OIL & GAS COMPANY (reported 2016-02)

Resolved via: schedulingHILLIN T. A.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

2025-11

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#442351 A HILLIN, T. A.
received 1995-11-30
#100765 A PERLMAN, WILLIAM
received 1980-12-03

Well Details

Well Number
2
Max Depth
6,000 ft
Drill Type
Vertical
County
TERRELL
District
7
Operator
HILLIN T. A.
Completed
1981-11-18

Operator

Location
KERRVILLE
P-5 Status
Y (filed 2020-09-04)
Cum Oil (all leases)
— bbl
Cum Gas (all leases)
11,534,376 mcf
Total Permits
6

External Links

Live © 2026 Petrora