42-443-30688
Final CompletionBROWN STATE 34
TERRELL County · District 7 · THOMPSON J. CLEO · GEDDIS CANYON (WOLFCAMP SAND)
Permits
1
Max Depth
10,000 ft
First Permit
1996-10-21
Latest Activity
1996-10-21
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1997-02-20
Shut-In
—
Plugged
2021-04-13
!
EWA / Permit operator mismatch
Scheduling: THOMPSON J. CLEO ≠ Permit: CONOCO INC.
Resolved via: scheduling → THOMPSON J. CLEO
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1997-02
Last Production
2021-04
Operator History
originally filed by CONOCO INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit Applications (1)
#454043 A CONOCO INC.
received 1996-10-17
Well Details
- Well Number
- 2
- Max Depth
- 10,000 ft
- Drill Type
- Vertical
- County
- TERRELL
- District
- 7
- Operator
- THOMPSON J. CLEO
- Completed
- 1997-02-20
Operator
- Name
- THOMPSON, J. CLEO
- Location
- DALLAS
- P-5 Status
- Y (filed 2023-11-03)
- Cum Oil (all leases)
- 34,884,610 bbl
- Cum Gas (all leases)
- 184,572,150 mcf
- Total Permits
- 1,739