42-445-31541

PAGE-RILEY

TERRY County · District 8 · THOMPSON J. CLEO · MOUND LAKE NW. (FUSSELMAN)

RRC Lookup

Permits

2

Max Depth

11,800 ft

First Permit

1989-03-03

Latest Activity

1989-03-03

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1989-04-30

Shut-In

Plugged

1990-07-28

!

EWA / Permit operator mismatch

Scheduling: THOMPSON J. CLEO ≠ Permit: TMBR/SHARP DRILLING, INC.

Resolved via: schedulingTHOMPSON J. CLEO

Operator History

originally filed by TMBR/SHARP DRILLING, INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#356667 A THOMPSON, J. CLEO
received 1989-03-30
#356667 A TMBR/SHARP DRILLING, INC.
received 1989-03-03

Well Details

Well Number
1
Max Depth
11,800 ft
Drill Type
Vertical
County
TERRY
District
8
Completed
1989-04-30

Operator

Location
DALLAS
P-5 Status
Y (filed 2023-11-03)
Cum Oil (all leases)
34,884,610 bbl
Cum Gas (all leases)
184,572,150 mcf
Total Permits
1,739

External Links

Live © 2026 Petrora