42-447-33217
Final CompletionEDENS G-H UNIT
THROCKMORTON County · District 7 · FAIRFIELD ENERGY CORP. · HAR-DAY (CADDO UPPER)
Permits
2
Max Depth
4,700 ft
First Permit
1982-06-22
Latest Activity
1987-02-05
Lifespan
5 yrs
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1987-01-30
Shut-In
—
Plugged
2001-07-19
!
EWA / Permit operator mismatch
Scheduling: FAIRFIELD ENERGY CORP. ≠ Permit: HARDING COMPANY
Resolved via: scheduling → FAIRFIELD ENERGY CORP.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2026-03
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (2)
Permit Applications (2)
#326192 A HARDING COMPANY
received 1987-02-05
#164253 A HARDING, CHARLES F.
received 1982-06-22
Well Details
- Well Number
- H 1
- Max Depth
- 4,700 ft
- Drill Type
- Vertical
- County
- THROCKMORTON
- District
- 7
- Operator
- FAIRFIELD ENERGY CORP.
- Completed
- 1987-01-30
Operator
- Name
- FAIRFIELD ENGY CORP
- Location
- DALLAS
- P-5 Status
- Y (filed 2010-12-03)
- Cum Oil (all leases)
- 5,118 bbl
- Cum Gas (all leases)
- — mcf
- Total Permits
- 1