42-449-30522

Final Completion

PLATINUM

TITUS County · District 6 · RUBIS OIL INC. · TRIX-LIZ EAST (WOODBINE 1ST)

RRC Lookup

Permits

2

Max Depth

4,500 ft

First Permit

1995-12-22

Latest Activity

1995-12-22

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

Shut-In

Plugged

2009-03-30

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-03

Last Production

2010-06

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#443107 A RUBIS OIL, INC.
received 1997-10-30
#443107 A ENERGY ARROW EXPLORATION, LLC
received 1995-12-21

Well Details

Well Number
1
Max Depth
4,500 ft
Drill Type
Vertical
County
TITUS
District
6

Operator

Location
DALLAS
P-5 Status
Y (filed 2019-09-06)
Cum Oil (all leases)
178,920 bbl
Cum Gas (all leases)
650,504 mcf
Total Permits
9

External Links

Live © 2026 Petrora