42-451-30605

Final Completion

POWELL MOSS

TOM GREEN County · District 7 · A.E.N. ENERGY INC. · DOVE CREEK E. (SAN ANGELO)

RRC Lookup

Permits

1

Max Depth

1,280 ft

First Permit

1980-03-27

Latest Activity

1980-03-27

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1980-04-06

Shut-In

Plugged

1984-03-07

!

EWA / Permit operator mismatch

Scheduling: A.E.N. ENERGY INC. ≠ Permit: HENDRIK'S HOLDING USA LTD.

Resolved via: schedulingA.E.N. ENERGY INC.

Operator History

originally filed by HENDRIK'S HOLDING USA LTD. — asset transferred

Permit Applications (1)

#76374 A HENDRIK'S HOLDING USA LTD.
received 1980-03-27

Well Details

Well Number
2-21
Max Depth
1,280 ft
Drill Type
Vertical
County
TOM GREEN
District
7
Completed
1980-04-06

Operator

Location
ABILENE
P-5 Status
Y (filed 1995-10-06)
Cum Oil (all leases)
21,461 bbl
Cum Gas (all leases)
— mcf
Total Permits
50

External Links

Live © 2026 Petrora