42-461-33370

INJECTION [SWD] Water

WADE RICHARDSON SWD 16

UPTON County · District 7 · PERMIAN SOLUTIONS LLC · AMACKER-TIPPETT (SAN ANDRES)

RRC Lookup

Permits

4

Max Depth

10,000 ft

First Permit

1993-02-11

Latest Activity

2009-05-27

Lifespan

16 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2009-12-11

Shut-In

Plugged

P-5 Org Status: Active

!

EWA / Production operator mismatch

Scheduling: PERMIAN SOLUTIONS LLC ≠ Production: CHEVRON U. S. A. INC. (reported 1994-02)

!

EWA / Permit operator mismatch

Scheduling: PERMIAN SOLUTIONS LLC ≠ Permit: WINDSOR ENERGY GROUP, L.L.C.

Resolved via: schedulingPERMIAN SOLUTIONS LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-04

Last Production

2026-03

Operator History

originally filed by WINDSOR ENERGY GROUP, L.L.C. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (4)

#681575 A WINDSOR ENERGY GROUP, L.L.C.
received 2009-05-27
#521679 A J OIL & GAS INC.
received 2002-07-09
#408894 A CHEVRON U. S. A. INC.
received 1993-03-24
#408894 A CHEVRON U. S. A. INC.
received 1993-02-10

Well Details

Well Number
1
Max Depth
10,000 ft
Drill Type
Vertical
County
UPTON
District
7
Completed
2009-12-11

Operator

Location
MIDLAND
P-5 Status
Y (filed 2026-02-04)
Cum Oil (all leases)
994 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/G, OPRS/O

External Links

Live © 2026 Petrora