42-461-33396

RICHARDSON 43-1

UPTON County · District 7 · THOMPSON J. CLEO · TRIUMPH (WOLFCAMP)

RRC Lookup

Permits

2

Max Depth

10,000 ft

First Permit

1993-05-26

Latest Activity

1993-05-26

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1993-09-29

Shut-In

Plugged

1995-03-28

!

EWA / Production operator mismatch

Scheduling: THOMPSON J. CLEO ≠ Production: OWENS PETROLEUM, INC. (reported 1994-08)

!

EWA / Permit operator mismatch

Scheduling: THOMPSON J. CLEO ≠ Permit: CHEVRON U. S. A. INC.

Resolved via: schedulingTHOMPSON J. CLEO

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1993-01

Last Production

1995-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#412040 A CHEVRON U. S. A. INC.
received 1993-10-15
#412040 A CHEVRON U. S. A. INC.
received 1993-05-24

Well Details

Well Number
2
Max Depth
10,000 ft
Drill Type
Vertical
County
UPTON
District
7
Completed
1993-09-29

Operator

Location
DALLAS
P-5 Status
Y (filed 2023-11-03)
Cum Oil (all leases)
34,884,610 bbl
Cum Gas (all leases)
184,572,150 mcf
Total Permits
1,739

External Links

Live © 2026 Petrora