42-461-37254

Final Completion

HALFF 2

UPTON County · District 7 · THOMPSON J. CLEO · SPRABERRY (TREND AREA)

RRC Lookup

Permits

1

Max Depth

11,500 ft

First Permit

2011-02-28

Latest Activity

2011-02-28

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2011-04-21

Shut-In

Plugged

2019-10-30

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2011-04

Last Production

2020-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#710945 A THOMPSON, J. CLEO
received 2011-02-24

Well Details

Well Number
1
Max Depth
11,500 ft
Drill Type
Vertical
County
UPTON
District
7
Completed
2011-04-21

Operator

Location
DALLAS
P-5 Status
Y (filed 2023-11-03)
Cum Oil (all leases)
34,884,610 bbl
Cum Gas (all leases)
184,572,150 mcf
Total Permits
1,739

External Links

Live © 2026 Petrora