42-461-39196

Final Completion

ELEANOR 2

UPTON County · District 7 · CHEVRON U. S. A. INC. · DAVIS (PENNSYLVANIAN)

RRC Lookup

Permits

1

Max Depth

11,900 ft

First Permit

2013-12-17

Latest Activity

2013-12-17

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2019-04-10

Shut-In

Plugged

2022-02-28

!

EWA / Permit operator mismatch

Scheduling: CHEVRON U. S. A. INC. ≠ Permit: PARSLEY ENERGY OPERATIONS, LLC

Resolved via: schedulingCHEVRON U. S. A. INC.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2014-04

Last Production

2022-05

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#775117 A PARSLEY ENERGY OPERATIONS, LLC
received 2013-12-05

Well Details

Well Number
1
Max Depth
11,900 ft
Drill Type
Vertical
County
UPTON
District
7
Completed
2019-04-10

Operator

Location
MIDLAND
P-5 Status
Y (filed 2025-11-04)
Cum Oil (all leases)
622,347,311 bbl
Cum Gas (all leases)
4,191,207,826 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/C, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,225

External Links

Live © 2026 Petrora