42-475-34382

Final Completion

CHEVRON UNIVERSITY 1

WARD County · District 8 · BELCO ENERGY CORP. · R.O.C. (CHERRY CANYON)

RRC Lookup

Permits

1

Max Depth

9,000 ft

First Permit

1996-06-12

Latest Activity

1996-06-12

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

1996-10-22

Shut-In

Plugged

2001-09-20

!

EWA / Permit operator mismatch

Scheduling: BELCO ENERGY CORP. ≠ Permit: CHEVRON U. S. A. INC.

Resolved via: schedulingBELCO ENERGY CORP.

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1996-12

Last Production

2001-10

Operator History

originally filed by CHEVRON U. S. A. INC. — asset transferred

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#449128 A CHEVRON U. S. A. INC.
received 1996-06-10

Well Details

Well Number
1
Max Depth
9,000 ft
Drill Type
Vertical
County
WARD
District
8
Completed
1996-10-22

Operator

Location
DALLAS
P-5 Status
Y (filed 2002-06-07)
Cum Oil (all leases)
8,718,082 bbl
Cum Gas (all leases)
10,927,451 mcf
Total Permits
109

External Links

Live © 2026 Petrora