42-475-34382
Final CompletionCHEVRON UNIVERSITY 1
WARD County · District 8 · BELCO ENERGY CORP. · R.O.C. (CHERRY CANYON)
Permits
1
Max Depth
9,000 ft
First Permit
1996-06-12
Latest Activity
1996-06-12
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1996-10-22
Shut-In
—
Plugged
2001-09-20
!
EWA / Permit operator mismatch
Scheduling: BELCO ENERGY CORP. ≠ Permit: CHEVRON U. S. A. INC.
Resolved via: scheduling → BELCO ENERGY CORP.
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1996-12
Last Production
2001-10
Operator History
originally filed by CHEVRON U. S. A. INC. — asset transferred
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#449128 A CHEVRON U. S. A. INC.
received 1996-06-10
Well Details
- Well Number
- 1
- Max Depth
- 9,000 ft
- Drill Type
- Vertical
- County
- WARD
- District
- 8
- Operator
- BELCO ENERGY CORP.
- Completed
- 1996-10-22
Operator
- Name
- BELCO ENGY CORP
- Location
- DALLAS
- P-5 Status
- Y (filed 2002-06-07)
- Cum Oil (all leases)
- 8,718,082 bbl
- Cum Gas (all leases)
- 10,927,451 mcf
- Total Permits
- 109