42-475-34530

SHUT IN Horizontal

WARWINK UNIVERSITY 18-33 B

WARD County · District 8 · APACHE CORPORATION · PHANTOM (WOLFCAMP)

RRC Lookup

Permits

3

Max Depth

12,650 ft

First Permit

1997-11-21

Latest Activity

2018-11-30

Lifespan

21 yrs

Regulatory Status

Schedule

ON SCHEDULE

Completion

2007-11-09

Shut-In

Plugged

P-5 Org Status: X

!

EWA / Production operator mismatch

Scheduling: APACHE CORPORATION ≠ Production: CALLON PETROLEUM OPERATING CO (reported 2023-12)

!

EWA / Permit operator mismatch

Scheduling: APACHE CORPORATION ≠ Permit: CALLON PETROLEUM OPERATING CO

Resolved via: schedulingAPACHE CORPORATION

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

1997-04

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (3)

#847135 A CALLON PETROLEUM OPERATING CO
received 2018-11-27
#627547 A CIMAREX ENERGY CO. OF COLORADO
received 2006-10-13
#470432 A PIONEER NATURAL RES. USA, INC.
received 1997-11-21
Lat 31.593344
Lon -103.296648

Well Details

Well Number
4H
Max Depth
12,650 ft
Drill Type
Horizontal
County
WARD
District
8
Completed
2007-11-09

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-10-04)
Cum Oil (all leases)
601,175,354 bbl
Cum Gas (all leases)
2,651,268,338 mcf
Activities
CSGD/G, CSGD/P, G/PUR, GTHS/G, GTHS/O, OPRS/G, OPRS/O
Total Permits
9,576

External Links

Live © 2026 Petrora