42-475-35100

Final Completion

AVARY 121

WARD County · District 8 · CALLON PETROLEUM OPERATING CO · HALEY (LWR. WOLFCAMP-PENN CONS.)

RRC Lookup

Permits

1

Max Depth

16,000 ft

First Permit

2006-06-06

Latest Activity

2006-06-06

Lifespan

< 1 yr

Regulatory Status

Schedule

OFF SCHEDULE

Completion

2007-01-13

Shut-In

Plugged

2019-04-10

!

EWA / Production operator mismatch

Scheduling: CALLON PETROLEUM OPERATING CO ≠ Production: AMEREDEV LLC (reported 2016-09)

!

EWA / Permit operator mismatch

Scheduling: CALLON PETROLEUM OPERATING CO ≠ Permit: CHESAPEAKE OPERATING, INC.

Resolved via: schedulingCALLON PETROLEUM OPERATING CO

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2007-01

Last Production

2019-04

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (1)

#619074 A CHESAPEAKE OPERATING, INC.
received 2006-05-10

Well Details

Well Number
1
Max Depth
16,000 ft
Drill Type
Vertical
County
WARD
District
8
Completed
2007-01-13

Operator

Location
HOUSTON
P-5 Status
Y (filed 2025-07-04)
Cum Oil (all leases)
139,541,454 bbl
Cum Gas (all leases)
731,756 mcf
Total Permits
1,234

External Links

Live © 2026 Petrora