42-475-36026

PRODUCING

UNIVERSITY 17-17

WARD County · District 8 · FLUX ENERGY LLC · CAPRITO (DELAWARE MIDDLE)

RRC Lookup

Permits

2

Max Depth

7,295 ft

First Permit

2012-03-14

Latest Activity

2012-03-14

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2012-05-10

Shut-In

Plugged

P-5 Org Status: Delinquent

!

EWA / Permit operator mismatch

Scheduling: FLUX ENERGY LLC ≠ Permit: SANDRIDGE EXPL. AND PROD., LLC

Resolved via: productionFLUX ENERGY, LLC

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2011-09

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#735255 A SANDRIDGE EXPL. AND PROD., LLC
received 2013-12-16
#735255 A SANDRIDGE EXPL. AND PROD., LLC
received 2012-03-05

Well Details

Well Number
5
Max Depth
7,295 ft
Drill Type
Vertical
County
WARD
District
8
Completed
2012-05-10

Operator

Location
SPRING
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
138,087 bbl
Cum Gas (all leases)
— mcf
Activities
OPRS/O

External Links

Live © 2026 Petrora