42-475-38703

PRODUCING Horizontal

CAVE BEAR 50 WA F

WARD County · District 8 · VITAL ENERGY INC. · PHANTOM (WOLFCAMP)

RRC Lookup

Permits

2

Max Depth

13,000 ft

First Permit

2023-11-09

Latest Activity

2023-11-09

Lifespan

< 1 yr

Regulatory Status

Schedule

ON SCHEDULE

Completion

2024-09-13

Shut-In

Plugged

P-5 Org Status: Delinquent

Production Summary

Cum Oil

bbl

Cum Gas

mcf

First Production

2024-09

Last Production

2026-03

Lease Production

Production is reported at the lease level. View production data, decline curves, and history on the lease page.

Permit Applications (2)

#894996 A VITAL ENERGY, INC.
received 2024-12-30
#894996 A POINT ENERGY PARTNERS PETRO, LLC
received 2023-11-01
Lat 31.583668
Lon -103.341170

Well Details

Well Number
6H
Max Depth
13,000 ft
Drill Type
Horizontal
County
WARD
District
8
Completed
2024-09-13

Operator

Location
TULSA
P-5 Status
Y (filed 2025-12-04)
Cum Oil (all leases)
96,588,189 bbl
Cum Gas (all leases)
19,400,308 mcf
Activities
OPRS/G, OPRS/O
Total Permits
337

External Links

Live © 2026 Petrora