42-477-30484
Final CompletionBAY HOUSTON TOWING
WASHINGTON County · District 3 · KERR-MCGEE CORPORATION · CHAPPELL HILL (WILCOX)
Permits
1
Max Depth
12,000 ft
First Permit
1982-07-27
Latest Activity
1982-07-27
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1982-12-15
Shut-In
—
Plugged
1986-11-11
!
EWA / Permit operator mismatch
Scheduling: KERR-MCGEE CORPORATION ≠ Permit: DELTA DRILLING CO.
Resolved via: scheduling → KERR-MCGEE CORPORATION
Operator History
originally filed by DELTA DRILLING CO. — asset transferred
Permit History (1)
Permit Applications (1)
#167382 A DELTA DRILLING CO.
received 1982-07-27
Well Details
- Well Number
- 1
- Max Depth
- 12,000 ft
- Drill Type
- Vertical
- County
- WASHINGTON
- District
- 3
- Operator
- KERR-MCGEE CORPORATION
- Completed
- 1982-12-15
Operator
- Name
- KERR-MCGEE CORP
- Location
- DALLAS
- P-5 Status
- Y (filed 2000-03-03)
- Cum Oil (all leases)
- 5,936,075 bbl
- Cum Gas (all leases)
- 108,132,656 mcf
- Total Permits
- 626