42-479-32206
Final CompletionLINK GEORGE F.
WEBB County · District 4 · TDC ENGINEERING INC. · LAREDO (LOBO)
Permits
1
Max Depth
8,000 ft
First Permit
1978-11-07
Latest Activity
1978-11-07
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1979-01-22
Shut-In
—
Plugged
1984-08-10
!
EWA / Permit operator mismatch
Scheduling: TDC ENGINEERING INC. ≠ Permit: TEXAS DRILLING CO.
Resolved via: scheduling → TDC ENGINEERING INC.
Operator History
originally filed by TEXAS DRILLING CO. — asset transferred
Permit History (1)
Permit Applications (1)
#36378 A TEXAS DRILLING CO.
received 1978-11-07
Well Details
- Well Number
- 2
- Max Depth
- 8,000 ft
- Drill Type
- Vertical
- County
- WEBB
- District
- 4
- Operator
- TDC ENGINEERING INC.
- Completed
- 1979-01-22
Operator
- Name
- TDC ENGINEERING, INC
- Location
- ABILENE
- P-5 Status
- Y (filed 2025-08-04)
- Cum Oil (all leases)
- 519,590 bbl
- Cum Gas (all leases)
- 5,474,807 mcf
- Activities
- OPRS/O
- Total Permits
- 224