42-479-33443
Final CompletionFAUSTO
WEBB County · District 4 · PETROPOINT ENERGY OPERATING LLC · M. M. A. (WILCOX 8100)
Permits
1
Max Depth
10,000 ft
First Permit
1982-09-09
Latest Activity
1982-09-09
Lifespan
< 1 yr
Regulatory Status
Schedule
OFF SCHEDULE
Completion
1983-02-16
Shut-In
—
Plugged
2013-12-12
!
EWA / Production operator mismatch
Scheduling: PETROPOINT ENERGY OPERATING LLC ≠ Production: MICHAEL PETROLEUM CORPORATION (reported 1998-09)
!
EWA / Permit operator mismatch
Scheduling: PETROPOINT ENERGY OPERATING LLC ≠ Permit: TDC ENGINEERING, INC.
Resolved via: scheduling → PETROPOINT ENERGY OPERATING LLC
Production Summary
Cum Oil
— bbl
Cum Gas
— mcf
First Production
1993-01
Last Production
2013-12
Operator History
Chain of Custody
Lease Production
Production is reported at the lease level. View production data, decline curves, and history on the lease page.
Permit History (1)
Permit Applications (1)
#171325 A TDC ENGINEERING, INC.
received 1982-09-09
Well Details
- Well Number
- 1C
- Max Depth
- 10,000 ft
- Drill Type
- Vertical
- County
- WEBB
- District
- 4
- Operator
- PETROPOINT ENERGY OPERATING LLC
- Completed
- 1983-02-16
Operator
- Location
- HOUSTON
- P-5 Status
- Y (filed 2014-12-05)
- Cum Oil (all leases)
- 10,614 bbl
- Cum Gas (all leases)
- 17,304,264 mcf
- Total Permits
- 8